OUR Archives

Date: 4/15/2008
TRSWA LFGTE Project - Direct Use Project

Project Objective:
Design/build and commission compression and dehydration plant at the Three Rivers Solid Waste Authority (TRSWA) landfill in Jackson, South Carolina to deliver 1,800 SCFM of LFG to
Read More >>
Date: 4/15/2008
Kimberly Clark LFGTE Project - Direct Use Project as Primary Boiler Fuel

Project Objective:
Design, install and commission seamless transfer boiler fuel conversion system for the plant's 130,000 #/hr package boiler.  Design will allow for either stand-alone firing
Read More >>
Date: 8/17/2008
Granger Energy Projects - Conestoga/Morgan Town LFGTE projects

Project Objective:
Design/build combustion equipment conversions to co-fire LFG at several end user sites, including Tyson's, Case New Holland, New Holland Concrete, HR Ewell, etc.  Multiple unit co
Read More >>
Date: 7/30/2007
Heat Recovery Project - Food Processing Facility

Project Objective:
On a food production line, recover the heat from the baking ovens' stacks to off set the fuel requirements for heating the cooking oil.  Flue gas flow through exchanger
Read More >>
Date: 6/25/2005
Tropicana Energy Recovery - Back Pressure Steam Turbine

Project Objective:

Engineer, install and comission a 800 HP steam tur

Read More >>
Date: 8/31/2004
AWI South Shelby LFGTE - Direct Use Project

CPL, in partnership with Solae/Dupont, Memphis Light Gas and Water, and Allied Waste, engineered, constructed and commissioned a 5000 scfm LFGTE project in under 150 days.  CPL was responsible for both ends
Read More >>
Date: 1/1/2004
Solae/Dupont LFGTE Project - Direct Use as Primary Boiler Fuel

CPL, in partnership with Solae/Dupont, Memphis Light Gas and Water, and Allied Waste, engineered, constructed and commissioned a 5000 scfm LFGTE project in under 150 days.  CPL was responsible for both ends
Read More >>
Date: 7/31/2005
WM Pecan Grove LFGTE Project - Direct Use Project

CPL, in partnership with Toro Energy, DuPont, Waste Management of Mississippi, Inc., EPA, MDEQ, MPUS and MDOT engineered, constructed and commissioned a 3,200 SCFM LFGTE project to supply LFG from Waste Man
Read More >>
Date: 7/31/2005
Dupont LFGTE Project - Direct Use as Primary Boiler Fuel

CPL, in partnership with Toro Energy, DuPont, Waste Management of Mississippi, Inc., EPA, MDEQ, MPUS and MDOT engineered, constructed and commissioned a 3,200 SCFM LFGTE project to supply LFG from Waste Man
Read More >>
Date: 1/11/2003
NASA / Toro Energy - NASA Goddard Space Flight Center -2003

CPL, in partnership with Toro Energy,design/build combustion equipment conversions for three units to co-fire LFG with both Natural Gas and #2 fuel oil. 