Project Objective:
Design/build and commission compression and dehydration plant at the Three Rivers Solid Waste Authority (TRSWA) landfill in Jackson, South Carolina to deliver 1,800 SCFM of LFG to
Design, install and commission seamless transfer boiler fuel conversion system for the plant's 130,000 #/hr package boiler. Design will allow for either stand-alone firing
Project Objective:
Design/build combustion equipment conversions to co-fire LFG at several end user sites, including Tyson's, Case New Holland, New Holland Concrete, HR Ewell, etc. Multiple unit co
On a food production line, recover the heat from the baking ovens' stacks to off set the fuel requirements for heating the cooking oil. Flue gas flow through exchanger
CPL, in partnership with Solae/Dupont, Memphis Light Gas and Water, and Allied Waste, engineered, constructed and commissioned a 5000 scfm LFGTE project in under 150 days. CPL was responsible for both ends
CPL, in partnership with Solae/Dupont, Memphis Light Gas and Water, and Allied Waste, engineered, constructed and commissioned a 5000 scfm LFGTE project in under 150 days. CPL was responsible for both ends
CPL, in partnership with Toro Energy, DuPont, Waste Management of Mississippi, Inc., EPA, MDEQ, MPUS and MDOT engineered, constructed and commissioned a 3,200 SCFM LFGTE project to supply LFG from Waste Man
CPL, in partnership with Toro Energy, DuPont, Waste Management of Mississippi, Inc., EPA, MDEQ, MPUS and MDOT engineered, constructed and commissioned a 3,200 SCFM LFGTE project to supply LFG from Waste Man
CPL, in partnership with Toro Energy,design/build combustion equipment conversions for three units to co-fire LFG with both Natural Gas and #2 fuel oil.