Combustion Equipment Conversions to Co-fire LFG

New Holland, PA

granger
tyson

Project Objective

  • Design/build combustion equipment conversions to co-fire LFG.

  • Offset NG with LFG.

Capital Cost

  • ~2.2M

  • Design Build and Commissioning of co-fired equipment

Expected Savings

  • Offset total of ~110 MMBtu/hr of NG

  • ~14.2 MMBtu/hr per boiler for six (6) boilers

  • ~6 MMBtu/hr per oil heater for five (5) oil heaters

Contact Us